Day 4 – Pool Install

It’s time to assemble the pool!

A team of 6 showed up and got straight to work. They started laying out all the metal panels in the right spots and a small team started to set up the filter/pump area.

One screw at a time they started connecting the panels and in a few short hours, the whole frame was up. Then they assembled the bench, stairs and tanning ledge. Once that was done, they leveled the whole frame and started adding all the inserts for the returns.

Time for a little lunch break.

At that point, the filter was mostly set up and they ran all the PVC around the pool. They connected all the runs together and added the line for the future waterfall.

They added plastic frames all around the pool that will be filled with concrete at a future date. This will serve as the supports for the decking around the pool and also keep the metal frames in place.

They set up the pressure test and ran an orange net around the pool to keep Luna from falling in the hole.

One single day and the whole pool frame and plumbing was done!

Update

8/18 – Plumbing hyrdo test passed inspection!