This is the first weekend day that they worked and we didn’t think they would show up because of the forecasted rain.
They were here at 7am and worked for about 3 hours.
They put down the vermiculite pool base, the smooth surface under the liner. They started by filling in the bench and the sundeck and then moved down into the deep end.
The one deep-end worker was like a magician at the end working on a pad at the very end that was attached to the ladder. After he climbed up, the pad came up with the ladder. Brilliant to watch!
They covered the pool and then it POURED for hours. Hopefully, that doesn’t matter!